Tag: Parsons

Parsons’ Sir Ambrose Shea Lift Bridge receives Transportation Award of Merit

The Sir Ambrose Shea Lift Bridge replacement — designed by Parsons — received the 2017 Transportation Award of Merit from the Consulting Engineers of Ontario

Parsons publishes 2017 corporate social responsibility report

Parsons released its 2017 corporate social responsibility report, People, Planet, Progress.

ASCE recognizes Parsons for McKinley Village Way Underpass

Parsons announced that the McKinley Village Way Underpass in Sacramento, Calif., was honored by the American Society of Civil Engineers (ASCE), Sacramento Section, with the 2016 Outstanding Urban Land Development Project Award.

Parsons honors Choe for Oroville Dam emergency response

Parsons recognized Charles Choe, a captain in the California Army National Guard and a project control engineer at Parsons, for his emergency assistance during an incident at Northern California’s Oroville Dam.

Parsons selected for I-95/LPGA Boulevard Interchange improvement in Florida

The Florida Department of Transportation, District 5 (FDOT District 5) selected Parsons to perform an interchange analysis for the conceptual layout and ultimate reconfiguration of the I-95 Interchange with LPGA Boulevard in Volusia County, Fla.

Parsons wins ACEC/MO award for Columbia I-70 Bridges Project

Parsons received the 2017 Grand Award in the transportation category from the American Council of Engineering Companies of Missouri (ACEC/MO) for the Columbia I-70 Bridges design-build project.

Parsons’ I-75 South Metro Reversible Express Lane Project opens

Parsons announced that the I-75 South Metro reversible express lane project will open during the Jan. 28-29 weekend, giving Atlanta motorists the option to travel nearly 13 miles between Highway 138 and Highway 155 on the new, double-lane addition to the I-75 median.

Parsons’ Ohio River Bridges East End Crossing Project opened to traffic

Parsons announced that the Ohio River Bridges East End Crossing — now named the Lewis and Clark Bridge — opened to traffic on Sunday, Dec. 18 to connect SR 265 in Indiana with the Gene Snyder Freeway in Kentucky. The ribbon-cutting ceremony for the 2,500-foot-long cable-stayed bridge was held the same day and marked the substantial completion of the $2.3 billion Louisville Southern Indiana Ohio River Bridges project.

Parsons to lead environmental review and prepare preliminary design for I-69 Ohio River Crossing

After an extensive Request for Proposal (RFP) process, the Indiana Department of Transportation (INDOT) and the Kentucky Transportation Cabinet (KYTC) selected Parsons to lead the environmental review and complete the preliminary design for the I-69 Ohio River Crossing project.

Latest News

Follow this informative guide by Geometricbox for contacting WordPress support

X