Erosion & Sediment Control on Linear Utility Projects

This webcast aired on Thursday, Aug 15, 2019

Hold on for a non-stop one-hour webinar ride! Review innovative design features for erosion, sediment, and turbidity control for linear utility applications. Pick up new technologies as a plan designer that you can incorporate into your next SWPPP. Obtain tips as a project manager to deliver environmental protection components of your job on budget and on time. Learn how to properly install and maintain innovative BMPs on linear projects as a site superintendent or lead foreman. Discover methods to address containment, recovery, and restoration for horizontal directional drilling inadvertent returns.

Learning Objectives:

  • Build margin into the E&SC plan design for linear pipelines
  • Emphasize additional protective methods and measures at environmentally sensitive areas
  • Discover implementation and Execution tips for Storm Ready projects
  • Review flocculant applications to maximize treatment of construction stormwater runoff
  • Introduce methods to manage Inadvertent releases for horizontal directional drilling operations

Presented by Ted Sherrod, PE

Ted Sherrod is a Principal Environmental Engineer with AECOM with key responsibilities involving management of construction stormwater and post-construction stormwater programs, design of stormwater control measures and training materials, and development of stormwater management plans for private and public sector clients.

Sponsored by:

 


Take the quiz and earn your PDH/CEU

Download Slides

1. 

Staged seeding involves:

2. 

Regulators consider tree cutting a land disturbing operation

3. 

Construction Phasing Considerations are:

4. 

BMP Implementation and Maintenance Principles are:

5. 

Which tool is not recommended on Linear utility jobs?

6. 

Linear Utility Jobs need _____ water diversions:

7. 

What seres as a drainage break in long runs of silt fence to intercept runoff and provides additional sediment control in low/sag locations?

8. 

Consider _____ where water impoundments occur downstream

9. 

Insist on adequoate LOD for staging/stockpiling areas and sediment storage.

10. 

Specify Biodegradable rolled or hydraulic ED product in ESA's

Name
Email
Business Name
Job Title