Tuesday, November 12, 2019

Tag: pipeline

‘Sweating’ Pipeline? No Sweat

Chemically Bonded Phosphate Ceramics protects in-use, wet pipeline with an anti-corrosive coating with no VOCs or HAPs    By Del Williams When an electric utility in...

Research program makes plans for more resilient linear infrastructure

The Engineering and Physical Sciences Research Council (EPSRC) announced a new £4.8 million engineering research program, led by Newcastle University, that will examine how long linear infrastructure assets, such as road and railway slopes, pipeline bedding and flood protection structures, can be better maintained and monitored to make them more resilient

Alliance Water selects LAN as pipeline engineering consultant for major water project

The Alliance Regional Water Authority (Alliance Water) selected Lockwood, Andrews & Newnam, Inc. (LAN) as a pipeline engineering consultant for a major water project that will serve several communities in the I-35 corridor.

Favorable court decision advances NAWS project

The North Dakota State Water Commission and U.S. Department of the Interior's Bureau of Reclamation have been granted permission to proceed with efforts to restart construction on the Northwest Area Water Supply (NAWS) project in the wake of a positive ruling by the U.S. District Court for the District of Columbia.

AEC TECH NEWS: SwRI’s pipeline inspection technology detects coating defects using magnetic field variations

Southwest Research Institute (SwRI) patented a new technology to inspect coatings of pipelines installed through horizontal directional drilling.

ASCE publishes updated practices for auger boring

Horizontal Auger Boring Projects, Second Edition, is a comprehensive manual of practice covering horizontal auger boring techniques for pipeline crossing.

DEP approves Pennsylvania pipeline project permits

After extensive review, the Pennsylvania Department of Environmental Protection (DEP) approved the permit applications from Sunoco Pipeline LP for the PA Pipeline Project/Mariner East 2 pipeline project.

City of Houston to build 16.5-mile waterline

The City of Houston will be advertising for bid in December 2016 the first three segments of a new 16.5 mile Northeast Transmission Waterline.
25,054FansLike
2,660FollowersFollow
108SubscribersSubscribe

Latest News

Follow this informative guide by Geometricbox for contacting WordPress support