Tag: KAI Design & Build
KAI Design & Build announces restructuring, new leadership roles
KAI Design & Build announced a corporate restructuring and will now be known as KAI Enterprises, serving as the parent company of four new subsidiaries — KAI Design, KAI Engineering, KAI Build and KAI 360 Construction Services (KAI 360 CS).
KAI Receives Design-Build Institute of America Award
KAI Design & Build’s design-build team received a Design-Build Institute of America – Mid-America Region (DBIA-MAR) 2018 Honor Award in the Commercial-Office Buildings category for the Deaconess Center for Child Well-Being in St. Louis.
KAI Design & Build acquires Volk Construction Company
KAI Design & Build acquired St. Louis-based Volk Construction Company, effective Oct. 1, 2018. The acquisition provides KAI’s clients with a greater pool of construction expertise and talent, and Volk’s clients with a greater depth of integrated design and construction solutions.
KAI Design & Build acquires Dorsey Engineering, Inc.
KAI Design & Build acquired Atlanta-based Dorsey Engineering, Inc., effective Oct. 1, 2018. The acquisition expands KAI’s service reach into Georgia and Florida.
Interactive programming and design process helps KAI meet tight deadline
KAI Design & Build completed construction of St. Louis' new $8.5 million Deaconess Center for Child Well-Being — a 21,272-square-foot facility completed within just 7.5 months.
KAI Design & Build completes 1,200-foot-long, elevated pedestrian skywalk
KAI Design & Build, along with Joint Venture Partner Paric Corporation, announced completion of a 1,200-foot-long, elevated pedestrian skywalk project.
KAI Design & Build receives Best Practice Awards
KAI Design & Build was recently honored with a pair of Construction Industry Best Practice Awards from the St. Louis Council of Construction Consumers.
KAI Design & Build awarded contract to design St. Louis Community College’s new Allied...
KAI Design & Build was awarded a consulting contract with St. Louis Community College (STLCC) to design the new Allied Health Center on the college’s Forest Park campus.
KAI Design & Build helps St. Louis MSD resume services after historic floods
At the start of 2016, the St. Louis Metropolitan Sewer District (MSD) contracted with KAI Design & Build to provide emergency relief services after historic rains and severe flooding at the end of 2015 caused the shutdown of two of its wastewater treatment plants, and damage to a third plant.